An advice to TPI Consultants
Dear
Third Party Inspection Consultants (TPIC), Salt Lake, July 11, 2012
Please find below the draft format of
your Proposal for any of your new Consultancy Services pertaining to Third Party Inspection
in respect of the specified scope of work for different identified areas of the
Packages/Bought-Out-Items (BOI) of 2x500/2x250 MW Coal Based Thermal Power
Project of any esteemed Customer. Please process your Proposal as per format
covering all the aspects as detailed hereunder. If it is a limited tender
and compliance of QR has already been achieved then Cover - 3 may be treated
redundant.
Regards,
Debabrata Dey
DRAFT PROPOSAL
Subject - Proposal
for Third Party Inspection under Consultancy Services for
2x500/2x250 MW Coal Based Thermal Power Projects
The Proposal for TPI shall
be contained in transparent Plastic Covers consisting of:-
1.
Cover 1 - Index Front Page with titles/subtitles
of contents under Cover 2 to 11
2.
Cover 2 - Forwarding Letter of TPIC
addressed to the esteemed Customers
- Cover 3 - Qualification Requirements (QR) of TPIC for the TPI assignment
(i)
Address
judiciously the essential Financial Requirements in compliance with QR; enclose
Annual Reports for the FY 2011-12, 2010-11 & 2009-10
(ii)
Address
judiciously the essential QR pertaining to past experiences; enclose end users’
certificates (at least 2) for similar jobs in last 10 years
(iii)
Enclose
list of similar jobs in tabular form (already executed/under execution) with a
clear deposition of schedule/actual dates of start/finish
4.
Cover 4 - Strength of Manpower
(Experts/Inspectors) of the TPIC with credentials of such Experts/Inspectors
indicating age, aptitude, status, skill etc.
- Cover 5 - Infrastructural facilities available with the TPIC: Details of RIO (Regional Inspection Office) of the TPIC to be operated at different Units of BHEL including Metros / other locations as may be necessary for different Packages/BOI of esteemed Customers
6.
Cover 6 - Tentative Deployment
Schedule of TPIC’s Experts/Inspectors at different Units of BHEL including
Metros for Inspection of different Packages/BOI covering the specified Time
Schedule earmarked for TPI Consultancy Services
7.
Cover 7 - Detailed Man-month/Man-day
Schedule in tabular form for the deputed Experts/Inspectors of the TPIC covering
specified scope of work at different Units of BHEL including Metros/other
locations as may be necessary for different Packages/BOI; schedules shall be separate
for Man-month and Man-day
8.
Cover 8 - Terms and Conditions
of the Bid to be submitted by the TPIC; there should not be any Deviation. If there
be, then enclose a separate Deviation Sheet
- Cover 9 - Financial Proposal in tabular Form clearly indicating:-
(i) Man-month
Rate (Firm Price) including lump sum firm price for total Man-months till
completion of inspection shall be envisaged by the TPIC with detailed break-up for respective
Packages and Bought-Out-Items with an extended validity of one (1) year
beyond specified completion schedule
(ii) Separate
Man-day Rates (Firm Price) for local/foreign inspections for respective
Packages and Bought-Out-Items with a special mention of reimbursement of
incidental charges at actual (cost of car/rail/air travel and accommodation)
with an extended validity of one (1) year beyond specified completion schedule;
may request 10% escalation beyond 1 year
(iii) Special
mention for claim of prevailing/enhanced rates of Service Tax or any other Tax
along with monthly/quarterly invoices during its submission
(iv) A
specific note should take care of the possibility of “Time Overrun” of the
Project with unavoidable direct impact for time extension of TPI Consultancy
Services which may not be attributable to the TPIC
10. Cover
10 -
Details of Company Profile of the TPIC with coloured Photos and CD
- Cover 11 - Proposal of the TPIC in soft form i.e. CD (replica of hard copy)
DRAFT PRICE FORMAT
A. Format of Lump sum Price to be offered by the TPIC:
I. Man-month Basis
Sl. No.
|
Activity Name
|
Lump sum
Price for the service*
|
Estimated
Man-month
Considered
|
Unit Rate of Man-month (Local)
|
Service Taxes
|
Total In
(Rs.)
|
In Figure
|
In Figure
|
|||||
1.
|
Main Plant
Package:
Contractor
- BHEL
|
Covering
different BHEL units in tandem
|
As per the then prevailing Rate
|
|||
2
|
Coal
Handling Plant Package
|
Covering workshops in tandem
|
||||
Grand Total (Sl. No.1 + Sl. No.2) :
|
||||||
Note: * Cost of lump sum Man-month rate shall be inclusive of taxes and levies,
TA/DA,
accommodation and
all other expenses; but, excluding Service Tax and education cess
II. Man-day Basis
Sl. No.
|
Activity Name
|
Lump sum
Price for the service*
|
Estimated
Man-day as
|
Unit Rate of Man-day (Local/Foreign)
|
Service Taxes
|
Total In
(Rs.)
|
In Figure
|
In Figure
|
|||||
1.
|
Main Plant
Package: Contractor - BHEL
|
200
Man-day
|
As per the then prevailing Rate
|
|||
2
|
Coal
Handling Plant Package
|
100
Man-day
|
||||
3.
|
Ash
Handling Plant Package
|
100
Man-day
|
||||
4.
|
Intake Water
and Plant Water System Package
|
100
Man-day
|
||||
Grand Total [Sl. No.1 + Sl. No.2 + Sl. No.3 + Sl. No.4] :
|
||||||
Note: * Cost of lump sum Man-day rate shall be inclusive of taxes and levies and DA; but,
excluding TA, accommodation and Service Tax and education cess
excluding TA, accommodation and Service Tax and education cess
Lump Sum Price (A I +A II):
B. Man-day Rate (applicable beyond specified
man-days under Sl. No. A.II):
Sl. No.
|
Activity Name
|
*Unit Rate of Man-day (Local/Foreign)
|
Service Taxes
|
|
1.
|
Main Plant Package: Contractor - BHEL
|
As per the then prevailing Rate
|
||
2.
|
Coal Handling Plant Package
|
|||
3.
|
Ash
Handling Plant Package
|
|||
4.
|
Intake Water
and Plant Water System Package
|
Note: * Man-day rate shall be inclusive of taxes and levies and DA; but, excluding TA,
accommodation and Service Tax and education cess
Special Note: The lump sum prices/unit rates (on Man-month and Man-day basis) as
mentioned under Sl. Nos. (A) and (B)
above, shall be firm
with an
extended validity of one (1) year beyond specified completion schedule
extended validity of one (1) year beyond specified completion schedule